• Remodel Kitchen
  • Replace Chain Link Fence
  • Landscaping (Back Yard)
  • Landscaping (South Side of House)
  • Plan Kitchen Remodel (in progress but on hold)
  • Add Back Stoop
  • Add Wooden Storm Windows (in progress)
  • Replace Storm Door
  • Repair and Paint Garage
  • Replace Garage Door
  • Furnish Guest Room
  • Paint Exterior
  • Reglaze Windows
  • Remove Front Fence
  • Repair Stucco on Front Gable
  • Repair Exterior Woodwork (Flowerbox, Brackets, Decorative Caps, and Beadboard)
  • Remove Siding
  • Paint Metal Vent Covers
  • Remove Flooring and Refinish Pine Floors in Kitchen, Mudroom, and Breakfast Nook
  • Finalize Exterior Color Palette
  • Landscaping (Round Two)
  • De-sod North Side of Front Yard
  • Remove Porch Screens
  • Strip Paint in DR
  • Strip Paint in LR
  • Remove Kitchen Linoleum
  • Strip Woodwork in Hall
  • Organize Mudroom
  • Convert Light Switches (Phase Two)
  • Paint Basement Steps
  • Convert Light Switches (Phase One)
  • Replace Thermostat
  • Winterize Lawn
  • Sew Living Room Curtains
  • Replace Front Door
  • Paint Porch Floor
  • Paint Iron Handrails (Back Stoop and Basement)
  • Remove Paint from Attic Window
  • Remodel Bathroom
  • Install Period Light Fixtures in Bedroom, Office, Dining Room
  • Add Front Landscaping
  • Remove Shrubs
  • Add Closet Organizers
  • Remove (Six!) Ceiling Fans
  • Paint Throughout
  • Remove Paneling in Breakfast Nook
  • Remove Fireplace Guard
  • Remove Carpet
  •  

2 Responses to “To-Do List”


  1. I’m very impressed…and how great that you leave the “done” stuff on the list – it’s so rewarding (I do that with paper lists too)!

  2. thesharepointmuse Says:

    WOW WOW WOW WOMAN!

    Great job!

Leave a Reply